設備安裝要求-PFG系列輥壓機使用說明書(3)

第六章 設備安裝要求

Chapter 6 Equipment Installation Requirements

輥壓機在出廠時主要是分為四大部分運輸的。一:主機部份,包括主機架、進料裝置、液壓裝置、潤滑系統; :兩套軸系:行星減速器; :主電機; 另外還有附屬配套設備。因此初次在現場安裝工作量較小。主要是安裝傳動系統各部件。為了使用戶在設備檢測和保養時,能正常安裝各個零、部件,保證設備正常使用,提出如下要求,請用戶務必遵行。

The roller press is mainly divided into four parts for transportation when it leaves the factory. One: The main machine part, including the main frame, feeding device, hydraulic device, and lubrication system; Two: Two sets of shafting system; Three: Planetary reducer; Four: Main motor; In addition, there are auxiliary equipment. Therefore, the initial installation workload on site is relatively small. Mainly install the components of the driving system. In order to enable the user to install various parts and components normally during equipment inspection and maintenance, and to ensure the normal use of the equipment, the following requirements are proposed, which the user must comply with.

一.各部件、系統總安裝順序

1. The overall installation sequence of components and systems

1.安裝主機部分;

1. Install the main machine part;

設備進廠初次安裝;

⑴The first installation of equipment into the factory;

安裝主電動機;

⑵Install the main motor;

安裝行星減速器;

⑶ Install planetary reducer;

校正主電機位置并安裝萬向節傳動軸;

⑷ Correct the position of the main motor and install the universal joint drive shaft;

安裝扭矩支承裝置。

⑸ Install torque support device.

2.各裝系統、部件安順序框圖

2. The sequence diagram of the installation system and components

 

主機架main frame 主電動機main motor

液壓油缸Hydraulic cylinder  輥罩roller cover

主軸軸系main shaft system

完成機架安裝complete the installation of frame

潤滑系統Lubrication system  行星減速機Planetary reducer  進料裝置feeding device

液壓系統hydraulic system 萬向節傳動軸Universal joint drive shaft  扭矩支承Torque support

檢測系統Detection system

.主機架安裝

2. Main frame installation

  1. 主機架一般是做為一個整體出廠,其安裝順序如下:

    1. The main frame is generally shipped as a whole, and the installation sequence is as follows:

    以兩立柱的承載銷和定位銷為基本定位,用高強度螺栓組將上、下橫梁與左右立柱聯接成一整體。在此應注意承載銷與銷孔是配作的,安裝時應分清配對的標記。

    ⑴ With the bearing pins and positioning pins of the two columns as basic positioning, the upper and lower beams and the left and right columns are connected into a whole with the high-strength bolt group. It should be noted that the bearing pins and pin holes are matched, and the matching marks should be distinguished during installation.

    將四條導軌安裝于機架的內腔上,四條導軌分兩種規格,寬度有所不同,兩條較寬的應安裝于靠近傳動側,即安裝于靠近主電機一側。

    (2) Install the four guide rails on the inner cavity of the rack. The four guide rails are divided into two specifications with different widths. The two wider ones should be installed near the drive side, that is, the side near the main motor.

    2.將主機架吊裝至預定的安裝位置。注意只能使用下橫梁的吊裝孔避免機架聯接螺栓受力。

    2. Hoist the main frame to the predetermined installation position. Note that only the lifting holes of the lower beam can be used to avoid stress on the frame connecting bolts.

    3.按照工藝設計圖紙校正主機架的水平位置及標高。必需注意主機架與兩主電機的相對位置。

    3. Correct the horizontal position and elevation of the main frame according to the process design drawings. It is necessary to pay attention to the relative position of the main frame and the two main motors.

    4.用水平儀校正主機架的水平,使主機架平面度公差小于2mm/m

    4. Use the spirit level to correct the level of the main frame so that the flatness tolerance of the main frame is less than 2mm/m.

    5.在機架完全安裝完畢后,應用力矩搬手擰緊高強度螺栓組,擰緊力矩為750N.m

    5. After the rack is completely installed, the high-strength bolt group should be tightened with torque hand, and the tightening torque is 750N.m.

    6.在機架聯接螺栓擰緊,并確認立柱與橫梁接合面無縫隙后,方可擰緊地腳螺栓。

    6. The anchor bolts can be tightened only after the frame connecting bolts are tightened and the joint surface of the column and the beam is confirmed to be seamless.

    .主軸軸系安裝

    3. Main shaft system installation

    軸系在出廠時是做為一個部件裝配好的,使用單位在將其安裝到位前,必須做一次全面的檢查,以保證以后的裝配質量,其裝配順序如下:

    The shaft system is assembled as a component when it leaves the factory. Before installing it in place, the user must do the comprehensive inspection to ensure the quality of subsequent assembly. The assembly sequence is as follows:

    1.松開并吊裝下主機架的橫梁。

    1. Loosen and hoist the beam of the lower main frame.

    2.因每套軸系重達26t,為防止起吊時整個軸系發生彎曲變形,我們建議起吊時用角鋼或槽鋼焊制一個矩形框架撐住四個起吊點。

    2. Since each shaft system weighs 26t, in order to prevent bending and deformation of the entire shaft system when lifting, we recommend using angle steel or channel steel to weld the rectangular frame to support the four lifting points when lifting.

    3.起吊固定輥軸系,將其固裝于主機架的左立柱側。

    3. Lift the fixed roller shaft system and fix it on the left column side of the main frame.

    4.在吊裝活動輥軸系時,先在其軸承座的上、下槽內涂以適量的潤滑脂,并以靠近傳動側的導軌為定位基準,將軸系裝于主機架內腔。

    4. When hoisting the movable roller shaft system, apply proper amount of grease to the upper and lower grooves of the bearing seat first, and install the shaft system in the inner cavity of the main frame with the guide rail near the driving side as the positioning reference.

    5.在保證導軌不與活動輥軸承座發生干涉的前提下,盡量調整磨輥的位置,使兩磨輥的工作段端面保持在同一垂直面內,這樣一方面可盡量增加工作段寬度,另一方面可使進料裝置中的側擋板盡量靠近磨輥端面,減少端面漏料,降低邊緣效應.

    5.Under the premise of ensuring that the guide rail does not interfere with the movable roller bearing seat, adjust the position of the grinding roller as much as possible to keep the end faces of the working section of the two grinding rollers in the same vertical plane, so that on the one hand, the width of the working section can be increased as much as possible, and on the other hand, the side baffle in the feeding device can be made as close as possible to the end surface of the grinding roller to reduce the material leakage of the end surface and reduce the edge effect.

    6.在兩磨輥安裝到位后,安裝位于兩磨輥之間的中間架,在安裝時必須保證兩點:⑴中間架與固定輥之間不能留有間隙,因中間架的作用就是將無物料擠壓時作用于活動輥上的液壓力通過固定輥傳遞到主機架,從而在主機架上平衡的,若二者之間留有間隙,則液壓直接作用在中間架上,有可能剪斷中間架與上、下橫梁的聯接螺栓;⑵為了防止無物料時,活動輥碰撞到固定輥,必須保證一定的原始縫,因此在中間架與活動輥之間必須加設墊板,以確保留有15mm的原始輥縫。

    6.After the two grinding rollers are installed in place, install the intermediate frame between the two grinding rollers. Two points must be ensured during installation: There must be no gap between the intermediate frame and the fixed roller, because the role of the intermediate frame is to transfer the hydraulic pressure acting on the movable roller when there is no material squeezing to the main frame through the fixed roller, so as to balance on the main frame. If there is gap between the two, the hydraulic pressure directly acts on the middle frame, and it is possible to cut the connecting bolts between the middle frame and the upper and lower beams; In order to prevent the movable roller from colliding with the fixed roller when there is no material, a certain original gap must be ensured. Therefore, the base plate must be added between the intermediate frame and the movable roller to ensure that the original roller gap of 15mm is left.

    安裝軸系水冷系統時,應確保旋轉接頭與主軸中心孔的同心度,以防止旋轉接頭跟轉。

    When installing the shafting water-cooling system, ensure the concentricity of the rotary joint and the center hole of the main shaft to prevent the rotary joint from rotating.

    .主電機及控制裝置安裝

    4. Installation of main motor and control device

    以固定輥中心線為基準,校正固定輥驅動電機的水平及垂直位置,必須保證:

    ⑴Taking the centerline of the fixed roller as the reference, correcting the horizontal and vertical position of the fixed roller driving motor, you must ensure:

    電機軸線與磨輥軸線同軸度為0.2mm

    Ⅰ The coaxiality between the motor axis and the grinding roller axis is 0.2mm.

    兩軸線夾角小于

    Ⅱ The angle between the two axes is less than 2°.

    主電機的地腳螺栓需在萬向傳動軸安裝完畢,并再次校對與磨輥軸線位置后,方可擰緊。

    ⑵The anchor bolts of the main motor can be tightened only after the universal joint shaft is installed and the position of the grinding roller axis is checked again.

    在接冷卻風機電機電源時,應注意風葉的轉向,以避免反接。

    ⑶ When connecting the cooling fan motor power, pay attention to the direction of the fan blade to avoid reverse connection.

    .行星減速器及縮套聯軸器的安裝

    5. Installation of planetary reducer and shrink sleeve coupling

    1.縮套聯軸器的安裝

    1. Installation of shrink sleeve coupling

    用汽油清洗縮聯軸器,在錐面、螺孔及螺桿均勻地涂一層10#20#機械油,注意不得采用含有二硫化鉬的潤滑油和脂。

    ⑴ Clean the shrink coupling with gasoline, and coated a layer of 10# or 20# mechanical oil evenly on the cone surface, screw hole and screw rod. Be careful not to use lubricating oil and grease containing molybdenum disulfide.

    將縮套聯軸器套于已清洗干凈的行星減速器中空輸出軸上,并推至輸出軸軸頸的圓弧邊緣位置。

    ⑵Sleeve the shrink sleeve coupling on the hollow output shaft of the planetary reducer that has been cleaned, and push it to the arc edge of the output shaft journal.

  2. 行星減速器的安裝

    2. Installation of planetary reducer

    在安裝前先用手盤動其輸入軸,看其內部運轉是否靈活;

    ⑴ Rotate the input shaft by hand before installation to see if its internal operation is flexible;

    用汽油將行星減速器中空輸出軸和磨輥主軸軸頸清洗干凈;

    ⑵ Use gasoline to clean the hollow output shaft of the planetary reducer and the main shaft journal of the grinding roller;

     

     

    將縮套聯軸器套于減速器中空軸上;

    (3) Put the shrink sleeve coupling on the hollow shaft of the reducer;

    起吊減速器使其軸線與磨輥主軸軸線盡可能保持一致;

    ⑷ Lift the reducer so that its axis is as consistent as possible with the axis of the grinding roller main shaft;

    將減速器緩慢,均勻地套于主軸軸頸上;

    ⑸Slowly and evenly sleeve the reducer on the main shaft journal;

    用力將減速器推行到位。注意:在加力時,不能將力直接作用于減速器輸入軸上。

    ⑹ Push the reducer in place forcefully. Note: When applying force, the force cannot be directly applied to the input shaft of the reducer.

    3.在行星減速器安裝于主軸完畢后,按如下規程均勻擰緊螺栓;

    3. After the planetary reducer is installed on the main shaft, tighten the bolts evenly according to the following procedures;

輥壓機減速機配套脹緊套鎖緊扭矩

Roller press reducer supporting expansion sleeve locking torque

序號

NO.

螺釘規格

Screw specifications

理論(N.M)

Theory (N.M)

建議(N.M)

Suggestion (N.M)

設定值

Set value

1

M 24

820

1100

a

2

M 27

1100

1300

a

3

M 30

1640

1800

a

4

M 33

2200

2350

a

 

注:在行星減速器安裝于主軸完畢后,按如下規程均勻擰緊螺栓;

Note: After the planetary reducer is installed on the main shaft, tighten the bolts evenly according to the following procedures;

a.用手將縮緊螺栓擰緊至擰不動為止;

a. Tighten the tightening bolts by hand until they can't move;

b.將力矩搬手的力矩數調至1/5a,按對角交叉擰緊;

b. Adjust the torque of the torque handle to 1/5a, and tighten it diagonally;

c.將力矩調至1/4a,將對角交叉擰緊;

c. Adjust the torque to 1/4a, and tighten the diagonal cross;

d.把力矩調至1/3a,將對角交叉擰緊;

d. Adjust the torque to 1/3a and tighten the diagonal cross;

e.1/2a的擰緊力矩, 將對角交叉擰緊;

e. Tighten diagonally crosswise with the tightening torque of 1/2a;

f.3/5a的擰緊力矩, 將所有螺栓擰緊;

f. Tighten all bolts with the tightening torque of 3/5a;

g.a的擰緊力矩, 將所有螺栓復緊一遍。

g. Retighten all bolts with the tightening torque of a.

.萬向節傳動軸的安裝

6. Installation of universal joint drive shaft

1.用汽油清洗減速器輸入軸,主電動機輸出軸及傳動軸兩端的法蘭盤;

1. Use gasoline to clean the input shaft of the reducer, the output shaft of the main motor and the flanges at both ends of the drive shaft;

2.將兩法蘭盤分別套于減速器輸入軸和主電動機輸出軸上;

2. Put the two flanges on the input shaft of the reducer and the output shaft of the main motor respectively;

3.在安裝好法蘭盤上的平鍵后,方可將中間段萬向節傳動軸就位,先安裝減速器一端;

3. After installing the flat key on the flange, the drive shaft of the universal joint in the middle section can be put in place, and one end of the reducer can be installed first;

4.用力矩搬手擰緊方向傳動軸軸承座與底盤的聯接螺栓;

4. Use the torque handle to tighten the connecting bolts of the direction drive shaft bearing seat and the base plate;

5.擰緊減速器聯接法蘭與萬向節傳動軸聯接法蘭的螺栓組;

5. Tighten the bolt group of the connecting flange of the reducer and the connecting flange of the universal joint drive shaft;

6.給主機通電,確認空載可行后,擰緊主電機聯接法蘭與萬向節傳動軸聯接法蘭的螺栓。

6. Power on the main machine, and after confirming that no load is possible, tighten the bolts of the connecting flange of the main motor and the connecting flange of the universal joint drive shaft.

.扭矩支承裝置安裝

7. Installation of torque support device

1.將預裝好的扭矩支承吊裝于減速器平衡臂上;

1. Hoist the pre-assembled torque support on the balance arm of the reducer;

2.將底座吊裝于扭矩支承的鉸鏈座上;

2. Lift the base on the hinge seat with torque support;

3.將底座找平,在保證底座與鉸鏈座的聯接螺栓能自由移動的前提下,找準好底座的位置,且將其與基礎固裝好;

3. Level the base, and under the premise of ensuring that the connecting bolts of the base and the hinge base can move freely, find the position of the base, and fix it with the foundation;

4.松開底座與鉸鏈座的聯接螺栓,調整蝶形彈簧的預緊力,其具體步驟如下:

4. Loosen the connecting bolts of the base and the hinge seat and adjust the preload of the butterfly spring. The specific steps are as follows:

每個減速器平衡臂上共設置八只蝶形彈簧,其中導桿上、下各四只,其安裝形式見扭矩支承裝配示意圖,這樣由于安裝上的不同,兩減速器內側平衡臂上的彈簧剛度為外側的四倍。

①A total of eight butterfly springs are set on the balance arm of each reducer, of which four are on the upper and lower guide rods. See the torque support assembly diagram for the installation form. In this way, due to the difference in installation, the spring stiffness on the inner balance arm of the two reducers is four times that of the outer.

利用超高壓油泵給液力螺母施壓,以對各平衡臂上的蝶形彈簧進行預緊,在預緊的同時,用手撥動下部的蝶簧,直到剛好用手撥不動為止,即表明各蝶簧組已處于自由狀態。

②Using the ultra-high pressure oil pump to pressurize the hydraulic nut to pre-tighten the butterfly spring on each balance arm. While pre-tensioning, move the lower butterfly spring by hand until it just can't be moved by hand. That means that each butterfly spring group is in the free state.

在第2步的基礎上,繼續擰緊螺母,直到擰過195°為止,這時的各蝶簧組即已處于適度的預緊狀態。

③On the basis of the second step, continue to tighten the nut until 195° , at which time the butterfly spring sets are in the proper pre-tightened state.

5.鉸鏈座的調整及固緊

5. Adjustment and tightening of hinge seat

1)在預緊好蝶形彈簧后,轉動減速器的高速軸,使兩平衡桿上鉸鏈點中心線處于同一水平面上。

(1) After pre-tensioning the butterfly spring, rotate the high-speed shaft of the reducer so that the center lines of the hinge points on the two balance bars are on the same horizontal plane.

2)對于固定輥端的扭矩支承,可從平衡桿的上鉸鏈點引垂線,調整鉸鏈座及平衡桿的位置,保證平衡桿的上.下鉸鏈點位于同一垂直平面內。找準此位置后,用調整墊片,消除掉鉸鏈座與底座間的間隙,擰緊兩者間的聯結螺栓。

(2) For the torque support of the fixed roller end, the vertical line can be drawn from the upper hinge point of the balance bar, and the positions of the hinge seat and the balance bar can be adjusted to ensure that the upper and lower hinge points of the balance bar are in the same vertical plane. After locating this position, use the adjusting gasket to eliminate the gap between the hinge seat and the base, and tighten the connecting bolt between the two.

3)對于活動輥端的扭矩支承,若條件允許,可用液壓系統將兩輥中心距離調整到位置后,再依步驟(2)對活動輥端扭矩支承進行緊固。若條件不允許,在安裝時也須保證兩扭矩支承中心距離。

(3) For the torque support at the movable roller end, if conditions permit, the hydraulic system can be used to adjust the center distance of the two rollers to the position, and then tighten the torque support at the movable roller end according to step (2). If conditions do not permit, the distance between the two torque support centers must also be ensured during installation.

6.沿軸線左.右搖動四個平衡桿,看其運轉是否靈活,若其搖動不靈活,則需重新調整,直至搖動靈活為止。

6. Shake the four balance bars to the left and right along the axis to see if they are flexible. If they are not flexible, they need to be re-adjusted until they are flexible.

.液壓系統安裝

8. Installation of hydraulic system

液壓系統在設備出廠時,其液壓缸、閥臺和泵站已安裝在主機架上。設備檢修和保養時,其安裝應按如下的步驟和要求進行。

When the hydraulic system leaves the factory, its hydraulic cylinder, valve table and pump station have been installed on the main frame. When the equipment is overhauled and maintained, its installation should be carried out according to the following steps and requirements.

1、管路安裝

1. Pipeline installation

1)液壓系統中所有管道必須按圖紙要求的規格選用,管子內壁應光滑清潔,無銹蝕、無氧化鐵皮等缺陷。(在試安裝后須經酸洗,中和、清洗、干燥等處理,)在安裝各管路和接頭時,必須注意各處的密封圈是否對位。所有接管應清除毛刺。

(1) All pipes in the hydraulic system must be selected according to the specifications required by the drawings. The inner wall of the pipes should be smooth and clean, free of rust, no oxide scale and other defects. (After the trial installation, it must be processed by pickling, neutralization, cleaning, drying, etc.) When installing the pipelines and joints, pay attention to whether the seal rings are aligned. All the connecting pipe should be deburred.

2、軟管安裝

2. Hose installation

1)應避免急轉彎,其彎曲半徑R﹥(910DD為軟管外徑)不要靠近接頭跟部彎曲,軟管接頭至開始彎曲處的最小距離為L=6D

(1) Avoid sharp turns. The bending radius R(910)D (D is the outer diameter of the hose) should not bend near the heel of the joint. The minimum distance between the hose joint and the beginning of the bend is L=6D.

2)在安裝和工作時,均不應有軟管扭轉現象。

(2) During installation and work, there should be no hose twisting.

3)軟管應保持一定的長度余量。

(3) The hose should maintain a certain length allowance.

3、液壓缸的安裝

3. Installation of hydraulic cylinder

1)檢查液壓缸的各組裝件有無損傷和銹蝕,尤其應注意耐磨環Y型密封圈及“O”形密封圈有無破損,用煤油清洗這些零件。

(1) Check the hydraulic cylinder's assembly parts for damage and corrosion. Pay special attention to whether the wear ring Y-shaped sealing ring and "O"-shaped sealing ring are damaged, and clean these parts with kerosene.

2)將耐磨環和Y型密封圈緩慢、小心裝入活塞上。在液壓缸缸體內壁涂以適量的液壓油,將活塞裝入缸體。

(2) Slowly and carefully install the wear ring and Y-shaped sealing ring on the piston. Coat the proper amount of hydraulic oil on the inner wall of the hydraulic cylinder and install the piston into the cylinder.

3)將裝好“O”形密封圈,耐磨環,無骨架防塵圈的端蓋緩緩套在活塞桿上,找準進出油孔的相對位置后,擰緊端蓋螺栓。

(3) Slowly put the end cover with the "O"-shaped sealing ring, wear ring, and no-frame dust-proof ring on the piston rod. After locating the relative position of the oil inlet and outlet holes, tighten the end cover bolts.

4)將與活塞桿頂端聯連的壓頭及壓頭座依次對中裝好,壓頭座內涂以適量的潤滑脂。

(4) Place the pressure head and the pressure head seat connected to the top of the piston rod in the center in turn, and coated the proper amount of grease to the indenter seat.

5)壓頭座與軸承座聯接時,注意在壓頭座的螺栓孔內裝入配置的螺栓套管,以保證螺栓上緊后螺栓頭與壓頭座端面的預留間隙,使壓頭座與軸承座之間的聯接處于游動狀態,以避免由于附加的徑向載荷造成密封件與缸體內壁的非正常磨損。

(5) When connecting the pressure head seat and the bearing seat, pay attention to inserting the configured bolt sleeve into the bolt hole of the pressure head seat to ensure the reserved gap between the bolt head and the end face of the pressure head seat after the bolt is tightened, make the connection between the pressure head seat and the bearing seat in the floating state, in order to avoid abnormal wear of the seal and the inner wall of the cylinder due to the additional radial load.

 6)在液壓缸吊起進行安裝時,與機架聯接的固定螺栓不要擰緊,在調整好與液壓連通管的位置后方可擰緊。注意,雜起吊時,應防止活塞滑出,發生意外事故。

(6) When the hydraulic cylinder is hoisted for installation, the fixing bolts connected to the frame should not be tightened, and can be tightened after adjusting the position of the hydraulic connecting pipe. Note that when lifting, the piston should be prevented from sliding out and accidents occur.

3、液壓系統閥臺安裝

3. Installation of hydraulic system valve table

1)清洗并檢查所有的零、部件,包括密封圈。

(1) Clean and inspect all parts and components, including seals.

2)將閥臺的左、右底座預先就位。安裝兩底座的連通管。注意檢查其接合面上的“O”形密封圈是否對位。

(2) Place the left and right bases of the valve table in advance. Install the connecting pipes of the two bases. Pay attention to check whether the "O" seal ring on the joint surface is aligned.

3)調整底座與連通管的相對位置,擰緊聯接法蘭和左右底座的聯接螺栓,應注意其“O”形密封圈是否對位。

(3) Adjust the relative position of the base and the connecting pipe, tighten the connecting bolts of the connecting flange and the left and right bases, and pay attention to whether the "O" seal rings are aligned.

4)蓄能器安裝時應可能使其垂直,其垂直度誤差應小于1.5mm/m。蓄能器與蓄能器底座間的螺紋聯接在安裝前應首先擰緊。

(4) It should be possible to make the accumulator vertical when installed, and its verticality error should be less than 1.5mm/m. The threaded connection between the accumulator and the accumulator base should be tightened first before installation.

5)電磁溢流閥在安裝前應仔細檢查清洗,在安裝注意油孔的配對,不可錯裝。另由于其上“O”形圈較多,應對其進行檢查,確定完好后裝入閥內,注意應使其對位,避免擰緊螺栓時擠傷。

(5) The electromagnetic overflow valve should be carefully inspected and cleaned before installation. Pay attention to the matching of the oil holes during installation. In addition, because there are many "O" rings on it, it should be inspected and put into the valve after confirming that it is in good condition. Pay attention to the alignment to avoid crushing when tightening the bolts.

6)電接點壓力表在系統充油排氣后進行安裝。

(6) The electric contact pressure gauge should be installed after the system is filled with oil and exhausted.

4、液壓泵站的安裝

4. Installation of hydraulic pump station

1)安裝前應先用煤油將油泵、油箱、閥類及管道清洗干凈,注意在清洗時不得使用棉紗,以免殘留在其內的紗絲堵塞系統元件。

(1) Before installation, clean the oil pump, fuel tank, valves and pipes with kerosene. Be careful not to use cotton yarn during cleaning, so as not to block the system components with the remaining yarn.

2)油泵與油泵電機在安裝時應保持同心,其同心度要求小于0.1mm,傾斜角不得大于。在安裝時,不得大力敲打泵和電機的主軸。

(2) The oil pump and the oil pump motor should be kept concentric during installation. The concentricity should be less than 0.1mm, and the inclination angle should not be greater than 1°. During installation, the main shaft of the pump and motor shall not be hit vigorously.

3)濾油器安裝前應仔細檢查其濾筒是否完好,在安裝時應注意進出油口的安裝位置。

(3) Before installing the oil filter, carefully check whether the filter cartridge is in good condition, and pay attention to the installation position of the oil inlet and outlet during installation.

九、潤滑系統的安裝

9. Installation of lubrication system

1、潤滑泵的安裝

1. Installation of lubrication pump

1)潤滑泵應垂直,固定安裝在粉塵較少的地方。

(1) The lubrication pump should be vertical and fixedly installed in the place with less dust.

2)潤滑泵的周圍應有足夠的空間,便于維修和給潤滑泵貯油筒加油脂。

(2) There should be enough space around the lubricating pump to facilitate maintenance and grease the lubricating pump oil tank.

3)應使潤滑泵上的壓力表面向便于觀察的方向上。

(3) The pressure surface on the lubrication pump should be in the direction that is convenient for observation.

2、管路及軟管的安裝

2. Installation of pipelines and hoses

1)所有硬管均為精拉管。安裝前均應仔細清楚管內的鐵屑等雜質。除掉管口的毛刺。

(1) All hard tubes are fine drawn tubes. The iron filings and other impurities in the pipe should be carefully cleared before installation. Remove burrs from the nozzle.

2)軟管的安裝要求參照液壓系統。

(2) Refer to hydraulic system for hose installation requirements.

.進料裝置安裝

10. Installation of feeding device

1.將輥壓機動輥推到原始輥縫(即最小輥縫)

1. Push the movable roller to the original roll gap (that is, the minimum roll gap).

2.吊裝進料裝置主體至輥壓機機架上平臺,調整好其位置,并擰緊聯接螺栓。

2. Hoist the main body of the feeding device to the platform of the roller press frame, adjust its position, and tighten the connecting bolts.

3.將傳動系統與支座安裝在支撐上,并固定在輥壓機機架上,并用銷軸連接絲桿與調節閘板。

3. Install the driving system and the support on the support, and fix it on the frame of the roller press, and connect the screw rod and the adjusting valve plate with pin shaft.

4.調節絲桿,將進料裝置兩側控制物料流量的調節閘板調到機械全關位置,保證兩閘板之間的最小距離為10~15mm,此數據作為電氣調試時使用的機械零點。

4. Adjust the screw rod and adjust the adjusting gates on both sides of the feeding device to control the material flow to the mechanical fully closed position to ensure that the minimum distance between the two gates is 10~15mm. This data is used as the mechanical zero point for electrical debugging. .

  1. 彈性頂緊裝置的安裝

        5. Installation of elastic jacking device

    將包括調節螺桿和蝶形彈簧座在內的所有零件預裝于頂緊架上;

    ⑴All parts including the adjusting screw and butterfly spring seat are pre-installed on the top tensioning frame;

    安裝頂緊架于機架上。注意務必使調節螺桿頂于側擋板的下端上;

    ⑵ Install the top tight frame on the rack. Note that the adjusting screw must be pressed against the lower end of the side baffle;

    適當擰緊預緊彈簧壓板;

    ⑶ Properly tighten the pre-tightened spring pressure plate;

    調節螺桿,使側擋板距磨輥端面間距在2mm之內,但不可擦到磨輥端面。

    ⑷Adjust the screw rod so that the distance between the side baffle and the end surface of the grinding roller is within 2mm, but the end surface of the grinding roller cannot be rubbed.

    十一.檢測裝置安裝

    11. Installation of detection device

    1.感應式位移傳感器安裝:

    1. Installation of inductive displacement sensor:

    將傳感器預安裝于保護架內,注意應使其工作時能處于線性位移段;

    ⑴ Pre-install the sensor in the protective frame, and pay attention to making it in the linear displacement section when working;

    選擇合適的位置安裝活動桿架,在活動桿架上有長孔可以調整其對傳感器的位置;

    ⑵Choose the suitable position to install the movable rod holder, there are long holes on the movable rod holder to adjust its position to the sensor;

    傳感器安裝后其活動桿移動的軸線應保證與磨輥軸承座移動相平行;

    ⑶ The axis of the movable rod movement after the sensor is installed should be parallel to the movement of the grinding roller bearing seat;

    在安裝傳感器時不允許敲打,不允許彎曲活動桿和壓環傳感器的不銹鋼外殼。

    ⑷It is not allowed to knock when installing the sensor, and it is not allowed to bend the stainless steel housing of the movable rod and pressure ring sensor.

    2.端面鉑熱電阻安裝

    2. End face platinum thermal resistance installation

    檢查安裝螺紋孔內是否有異物,是否正好對準軸承外圈;

    ⑴ Check whether there is any foreign matter in the installation threaded hole and whether it is aligned with the outer ring of the bearing;

    熱電阻的端面必須保證與軸承受壓側的外圈緊密接觸,使其真實地檢測出軸承溫度。

    ⑵The end face of the thermal resistance must be in close contact with the outer ring of the bearing pressure side, so that it can truly detect the bearing temperature.

    液壓泵站濾油器堵塞的壓差發迅器和潤滑泵貯油箱最小容量報警裝置均在出廠時已裝配好,一般情況下不要隨意拆卸;

    ⑶ The pressure difference transmitter blocked by the oil filter of the hydraulic pump station and the minimum capacity alarm device of the lubrication pump storage tank have been assembled at the factory, and generally do not disassemble it at will;

    潤滑系統工作檢測的接近開關在安裝時應注意與分油器活塞桿保持一定的距離(24mm)

    ⑷When installing the proximity switch for lubrication system work detection, keep the certain distance (24mm) from the piston rod of the oil separator.

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

 打印本頁 【關閉窗口】 向上
Copyright © 江蘇鵬飛集團股份有限公司 All Rights Reserved. 蘇ICP備17020817號-4 制作維護:海安雙贏網絡技術有限公司
主站蜘蛛池模板: 戴尔(成都)有限公司| 谢德尔汽车零部件有限公司| 大连冰山空调有限公司| 深圳永明光电有限公司| 大兴混凝土有限公司| 景智电子(厦门)有限公司| 杭州怡得乐电子有限公司| 徐州 铜业有限公司| 长城须崎铸造有限公司| 广东亚太金属有限公司| 和米有限公司怎么样| 辉瑞动物保健品有限公司| 珠海婚纱摄影有限公司| 清雅化妆品有限公司| 神木化学工业有限公司| 常州市给力机电有限公司| 派克液压天津有限公司| 必图实业东莞有限公司| 深圳易菲妮有限公司| 芭蒂娜服饰有限公司| 中精汽车部件有限公司| 希恩机械设备有限公司| 康宁(上海)光纤有限公司| 广州广业置业有限公司| 野宝车料工业有限公司| 天一牧业 有限公司| 卓轮(天津)机械有限公司| 瑞安瑞一机械有限公司| 上海元祖梦果子有限公司| 家利家具有限公司电话| 福建龙洲运输有限公司| 阿乐斯(广州)有限公司| 烟台通用东岳汽车有限公司| 深圳公共交通有限公司| 惠而浦(深圳)有限公司| 常州奇化工有限公司| 北京时尚家具有限公司| 山东鲁咨工程造价有限公司| 硕禾电子材料有限公司| 苏州国械机械有限公司| 联业制衣(东莞)有限公司| 广州千润有限公司招聘| 南通机电设备制造有限公司| 亿迈齿轮(太仓)有限公司| 重庆 防火门 有限公司| 山西福源药业有限公司| 万泰机械制造有限公司| 三森装饰工程有限公司| 天使丽化妆品有限公司| 尚雅装饰设计有限公司| 嘉泰包装材料有限公司| 韩华综化塑料有限公司| 淮南市豆制品有限公司| 上海克比精密模具有限公司| 大连中集集装箱有限公司| 四川水利设计有限公司| 天津柒一拾壹有限公司| 四川亚西机器有限公司| 深圳天达空港设备有限公司| 拓潽里得贸易有限公司| 中山伦灯灯饰有限公司| 建工三建设有限公司| 连云港化工贸易有限公司| 深圳嘉乐食品有限公司| 珠海德联工程有限公司| 北京国润能源有限公司| 宝莱特机械有限公司| 武进医疗器械有限公司| 云南天叶茶叶有限公司| 动视信息技术有限公司| 吉美瑞医疗器械有限公司| 广西 家纺 有限公司| 连云港通信有限公司| 宏兴隆湘莲食品有限公司| 湖北交通设施有限公司| 八达钢结构有限公司| 东莞市泡绵有限公司| 东莞华展电子有限公司| 泛华工程监理有限公司| 瑞达汽车制造有限公司| 北京佳创贸易有限公司| 日立金属 上海 有限公司| 上海长园维安有限公司| 创源电化学有限公司| 南京金融有限公司怎么样| 三森装饰工程有限公司| 江浦不锈钢有限公司| 南京服装贸易有限公司| 南昌 婚庆 有限公司| 上海华谊小额贷款有限公司| 深圳市森源电子有限公司| 广惠高速公路有限公司| 实耐宝工具仪器有限公司| 常州协鑫光伏有限公司| 乐高玩具(嘉兴)有限公司| 朗汇装饰工程有限公司| 上海思派贸易有限公司| 上海衡拓实业有限公司| 和其正食品有限公司| 尼岛(上海)有限公司| 贝斯特铸造有限公司| 苏夏工程设计有限公司| 郑州三和机械有限公司| 连云港机床有限公司| 安得利食品贸易有限公司| 博士达电子有限公司| 四川暖通设备工程有限公司| 上海富瀚微电子有限公司| 泰浩信息技术有限公司| 厦门市鹭滨有限公司| 南通小额贷款有限公司| 中山仪器仪表有限公司| 上海亨通光电有限公司| 无锡金比机械制造有限公司| 安特金属成形 上海 有限公司| 上实环境水务有限公司| 德恩德制药有限公司| 深圳市瑞比科有限公司招聘| 广东锻压机床有限公司| 云测信息技术有限公司| 瑞奈尔贸易有限公司| 江苏宏达新材料有限公司| 泰宇电子 上海 有限公司| 联轴器制造有限公司| 深圳市德兴电子有限公司| 南丰机械制造有限公司| 河南建达工程有限公司| 勘测技术与工程有限公司| 广州金霸建材有限公司| 广州市塑料工业有限公司| 汉跋技纺(苏州)有限公司| 挪华威认证有限公司| 上海申玻仪器有限公司| 常熟 粘合剂有限公司| 滁州市建筑安装工程有限公司| 山东消防设备有限公司| 马鞍山制药有限公司| 上海客贸易有限公司| 景涛景观设计有限公司| 同仁堂保健品有限公司| 金鹏钢结构有限公司| 珠海凯邦电机有限公司| 红板(江西)有限公司| 鸿鑫机械制造有限公司| 农业发展有限公司 简介| 佩特化工 上海 有限公司| 工程塑胶材料有限公司| 深圳市力能电子有限公司| 山东科学仪器有限公司| 东莞泰达电子有限公司| 万都北京汽车部件有限公司| 沃帕工业设备上海有限公司| 惠州三鑫玻璃有限公司| 中铁物资华南有限公司| 芮尚化妆品有限公司| 宁波新海电气有限公司| 鑫三合苏州有限公司| 宁波初田消防有限公司| 美声服饰辅料有限公司| 苏州宝之成电器有限公司| 九州实业发展有限公司| 天津电子衡器有限公司| 怀化建筑工程有限公司| 丰爱汽车座椅部件有限公司| 广州有限公司净水器| 科尔达电子有限公司| 丰泽高科信息技术有限公司 | 有限公司的股东数量| 西门子工程制造中心有限公司| 宁波市混凝土有限公司| 岚 光电 有限公司| 沧州四星玻璃有限公司| 佛山盈科工程有限公司| 金湖 美仪表有限公司| 上海致融信用征信有限公司 | 河南新开元有限公司| 南自信息技术有限公司| 河南仓储设备有限公司| 海拉贸易(上海)有限公司| 苏州奥加诺水处理有限公司| 奇特乐游乐设备有限公司| 史赛克医疗器械有限公司| 郑州 长城科工贸有限公司| 金信表面处理有限公司| 罗格朗低压电器有限公司| 天成农业发展有限公司| 浩荣机电设备有限公司| 佳林设备制造有限公司| 华润电力(宜昌)有限公司| 富硒农产品有限公司| 国美电器有限公司上海| 深圳乐町服装有限公司| 盛隆兴电子深圳有限公司| 四川成蜀电力有限公司| 青岛荏原环境有限公司| 宝钢美威车轮有限公司| 春金天津油脂有限公司| 中橡鞍山化学工业有限公司| 百信大药房有限公司| 浙江省直同人有限公司| 上海铝合金制品有限公司| 杭州杏辉天力药业有限公司| 惠群工艺深圳有限公司| 诚信会计事务有限公司| 艺龙装饰工程有限公司| 深圳 分秒有限公司| 三星数据西安有限公司| 本田制锁(广东)有限公司| 深圳市德兴电子有限公司| 松下健康医疗有限公司| 宏晟机械设备有限公司| 佳创(北京)贸易有限公司| 璧山县电子有限公司| 华盛天涯水泥有限公司| 大丰海嘉诺药业有限公司| 常熟 开关有限公司| 浙江南都电源有限公司| 北京承达装饰工程有限公司| 防腐涂装工程有限公司| 融万信息技术有限公司| 湖南省水利水电第一工程有限公司| 安美润滑油有限公司| 天宝装饰工程有限公司| 河南 肉食品有限公司| 海龙王泵业有限公司| 兴科电子(东莞)有限公司| 阿法拉伐有限公司招聘| 成都母婴用品有限公司| 台州润润机械有限公司| 浙江三维橡胶有限公司| 煜宸激光技术有限公司| 东莞环仪仪器有限公司| 万力实业发展有限公司| 北京照明光源有限公司| 上海莱尼电气有限公司| 上海铁钢国际贸易有限公司| 哈尔滨食品有限公司招聘| 友客便利连锁有限公司| 哈尔滨干燥设备制造有限公司| 杭州环保成套有限公司| 岳华会计师事务所有限公司| 汉华光电子有限公司| 河南斯食品有限公司| 快捷半导体 苏州 有限公司| 康田医疗器械有限公司| 浙江国电器有限公司| 上海成峰流体有限公司| 贝亿医疗器械有限公司| 蓝星清洗(北京)有限公司| 佰特装饰工程有限公司| 振华制药厂有限公司| 安徽宁国密封件有限公司| 青岛益佳贸易有限公司| 深圳鼎丰电子有限公司| 昆山茂迪新能源有限公司| 东方国际创业有限公司| 普联技术有限公司 地址| 宁波市混凝土有限公司| 长城装饰设计工程有限公司 | 北京峰艺装饰有限公司| 医美医院有限公司招聘| 鑫苑置业(成都)有限公司| 银农小额贷款有限公司| 沈阳医药连锁有限公司| 建滔(河北)化工有限公司| 上海则仁新材料有限公司| 四川成都成工工程有限公司| 湖南 农业有限公司 长沙| 华星机械制造有限公司| 惠丰润滑油有限公司| 银鹏动力设备有限公司| 天津海鸥表业有限公司| 上海墙风实业有限公司| 广西润发通信有限公司| 欧劳福林精细化工有限公司| 以赛亚自动化设备有限公司 | 南昌鑫昌化工有限公司| 宏信小额贷款有限公司| 光学膜材料有限公司| 新华园置业有限公司| 深圳旭美电子有限公司| 临沂教学设备有限公司| 深圳科瑞普光电有限公司 | 中睿合创广州有限公司| 苏州鸿硕精密电工有限公司 | 扬州北辰电气有限公司| 仕瑞达自动化设备有限公司| 永乐胶粘制品有限公司| 广州联存医药有限公司| 东莞伟旺达有限公司| 杭州九阳家电有限公司| 北京苏宁云商有限公司| 江西德贸易有限公司| 雷柏特实验室设备有限公司| 化妆品有限公司 oem| 深圳东方红有限公司| 必达福环境技术有限公司| 深圳华美塑胶有限公司| 华特汽车零部件有限公司| 富山阀门实业苏州有限公司| 力创电子有限公司怎么样| 三叶电器有限公司大连| 江苏晨光液压有限公司| 山东车桥制造有限公司| 天津经纬置地有限公司| 宁波车王电子有限公司| 冠品装饰工程有限公司| 浙江汽车座椅有限公司| 金雪制冷设备有限公司| 北京顶津食品有限公司| 贝儿孕婴用品有限公司| 合肥 萍 有限公司| 镭蒙机械设备有限公司| tcl通讯设备 惠州 有限公司| 路路达润滑油无锡有限公司| 东瑞机电设备有限公司| 河南境外就业有限公司| tcl家用电器 青岛 有限公司| 海伦国际贸易有限公司| 秦山核电运行有限公司| 上虞绍风化工有限公司| 诺特电子(东莞)有限公司| 泰莱贸易 上海 有限公司| 健康产业园有限公司| 安庆宝龙药业有限公司| 瑞萨电子上海有限公司| 成都联塑塑胶有限公司| 山东粉末涂料有限公司| 湖北武汉材料有限公司| 淄博化工设计有限公司| 上海平安保险有限公司| 青岛至诚实业有限公司| 湖州 有限公司 吴兴区| 广东港丰电器有限公司| 湖南润丰能源有限公司| 南玻浮法玻璃有限公司| 河北华盛化工有限公司| 烟台 传动技术有限公司| 三伊电力电子有限公司| 浙江晨机械有限公司| 阿尔法汽车有限公司| 木林森鞋业有限公司| 宁波众茂杭州湾热电有限公司| 惠州大亚湾 械有限公司| 上海园艺绿化有限公司| 芯灿半导体有限公司| 上海铁钢国际贸易有限公司| 中铁十六局轨道有限公司| 广州兴森快捷电路有限公司| 四川中江县有限公司| 陕西中展实业有限公司| 普朗医用设备有限公司| 华威建筑设计有限公司| 苏州井利电子有限公司| 台松精密电子有限公司| 思多而特运输上海有限公司 | 上海高贸易有限公司怎么样 | 杭州香麦隆食品有限公司| 北京星河亮点有限公司| 邯郸鹏博有限公司招聘| 湖南铭德医药有限公司| 语言桥信息技术有限公司| 南京先声药业有限公司| 安徽徽康置业有限公司| 石家庄龙力有限公司| 通产华晶玻璃有限公司| 云南昆钢钢结构有限公司| 中兴能源(天津)有限公司| 成都航天万欣有限公司| 百恒装饰工程有限公司| 山一电子(深圳)有限公司| 山东电动车制造有限公司| 中山仓储设备有限公司| 杭州阿尔法有限公司| 广州婚纱摄影有限公司| 邻动 北京 技术有限公司| 浙江电力建设监理有限公司| 珠海上富电技有限公司| 深圳市塑胶包装有限公司| 威讯联合半导体 德州 有限公司| 佳德威油漆有限公司| 保定车桥制造有限公司| 合肥长源液压有限公司| 深圳迈诺电子有限公司| 凯新认证(北京)有限公司| 讯芯电子(中山)有限公司| 福建赛得利纤维有限公司| 石家庄塑料包装有限公司| 杭州重汽销售有限公司| 彩虹合肥液晶玻璃有限公司| 鸿与智实业有限公司| 包头市铝业有限公司| 万宝松下空调有限公司| 在诺威实业有限公司| 北京利德华福电气有限公司 | 锐珂厦门医疗有限公司| 福州精细化工有限公司| 中粮张家港有限公司| 苏州艾普斯电源有限公司| 九江 辰 有限公司| 安阳玫瑰谷有限公司| 腾龙建设工程有限公司| 上海麦西恩食品有限公司| 世纪美服饰有限公司| 南通冠锦贸易有限公司| 津神鹿能源有限公司| 深圳市尚品服饰有限公司| 同煤漳泽电力有限公司| 爱江山餐饮有限公司| 宁波 欢 有限公司| 浙江成成模具有限公司| 百冠塑胶电子有限公司| 中科建设发展有限公司| 乐扣乐扣(苏州)有限公司| 南京新港建设发展有限公司| 上海煜鹏通讯有限公司| 深圳市凯瑞光电有限公司| 佳时达深圳有限公司| 华美复合材料有限公司| 顶金贵金属经营有限公司| 山东建科工程有限公司| 金山深圳电子有限公司| 华联服装配件有限公司| 玉环县液压工具有限公司| 广东户外用品有限公司| 润格莱电子有限公司| 南京金属复合材料有限公司| 四川华业地产有限公司| 泰克国际贸易上海有限公司| 兴源电力工程有限公司| 中德塑钢型材有限公司| 重庆住宅建设有限公司| 郑州郑东置业有限公司| 优米信息技术有限公司| 万香园食品有限公司| 成都千里电子设备有限公司| 洛克体育用品有限公司| 杭州立昂微电子有限公司| 神州长城国际有限公司| 安柏电路板有限公司| 陕西燃气工程有限公司| 深圳科浩电子有限公司| 月盛斋清真食品有限公司| 苏州佳彩精密有限公司| 山东花生制品有限公司| 卡尔史托斯内窥镜有限公司| 广东宝丽雅有限公司| 塑镕电容器有限公司| 深圳瑞安电子有限公司| 江森自控有限公司 成都| 光阵显示器有限公司| 汕头 服装 有限公司招聘| 重庆中中物资有限公司| 阿尔西制冷工程技术北京有限公司| 余姚汽车配件有限公司| 立迪生物技术有限公司| 江苏龙盘建筑装饰有限公司| 奥美工业深圳有限公司| 深圳市巨基有限公司| 铜川 食品 有限公司| 江西康缘药业有限公司| 威讯联合半导体 德州 有限公司| 飞尔特能源有限公司| 上海智城分析仪器有限公司| 蒙发利电子有限公司| 太仓和夏化学有限公司| 三达奥克化学有限公司| 上海鼎为有限公司怎么样| 太平保险有限公司陕西分公司| 嘉宝国际贸易有限公司| 广州兰姿化妆品有限公司| 广州雕塑工程有限公司| 佛山尚匠食品有限公司| 深圳东达实业有限公司| 世瑞新材料有限公司| 四川电梯销售有限公司| 中粮新沙粮油工业有限公司| 南阳路桥工程有限公司| 湖南电路板有限公司| 智慧产业有限公司招聘| 深圳隆科电子有限公司| 东莞市手板模型有限公司| 安正天津新材料有限公司| 泽华化学工程有限公司| 深圳迪斯科有限公司| 皖南电机销售有限公司| 北京应天海乐有限公司| 顺德区悦电器有限公司| 江门市地尔汉宇电器有限公司| 东和光电(苏州)有限公司| 信步自动门有限公司| 奥泰斯能源有限公司| 玉柴东特汽车有限公司| 佛山灯港照明有限公司| 山东物资有限公司地址| 安时利医疗有限公司| 广州振杰机械有限公司| 上海璐柯宏电子有限公司| 五金冲压件有限公司| 索菲亚电子有限公司| 新疆青松建材有限公司| 山东特种汽车有限公司| 广东华力电气有限公司| 安徽材料有限公司蚌埠| 洛阳钨钼制品有限公司| 天目电子(深圳)有限公司| 万宝松下空调有限公司| 元进耐火材料有限公司| 中塑进出口有限公司| 怡昌塑胶制品有限公司| 重庆庆达环保工程有限公司| 伟通电子(上海)有限公司| 宁夏恒力钢丝绳有限公司| 双鹤机械制造有限公司| 金刚石电机苏州有限公司| 杭州华电江东热电有限公司| 深圳旅游发展有限公司| 上海达肯机械有限公司| 东丽塑料深圳有限公司| 荆州荆湖食品有限公司| 远东交联电缆有限公司| 阿尔西制冷工程技术北京有限公司| 上海严林信息技术有限公司| 无锡百合织造有限公司-| 青岛朗盛贵金属有限公司| 羽西化妆品有限公司| 苏星洗涤机械有限公司| 山东鑫农农药有限公司| 徐州 中兴建设有限公司| 登腾医疗器械有限公司| 广东南方数码有限公司| 深圳达玩具有限公司| 广西三林业有限公司| 浙江华越建筑设计有限公司| 富士通通信技术有限公司| 深圳市嘉源实业有限公司| 济南啤酒设备有限公司| 达富电脑苏州有限公司| 济南东泰机械有限公司| 江西天化学有限公司| 深圳市明伟电子有限公司| 廊坊市政工程有限公司| 姿韵化妆品有限公司| 广州明美光电有限公司| 瑞林景观园林有限公司| 无锡金比机械制造有限公司 | 北京电梯安装工程有限公司| 常州豪爵铃木有限公司| 常德 饮料有限公司| 奥利焙食品机械有限公司| 东莞佳鸿机械有限公司| 珠江特种纸有限公司| 深圳理邦医疗有限公司| 深圳市欣和电子有限公司| 北京英纳超导有限公司| 柒一拾壹商业有限公司| 圣翰医疗器械有限公司| 东丽塑料 深圳 有限公司| 小田(中山)实业有限公司| 曲一线图书策划有限公司| 中益油墨涂料有限公司| 甘肃 自动化设备有限公司| 久润国际贸易有限公司| 耐特汽车电子有限公司| 吉安市建筑工程有限公司| 安吉医疗器械有限公司| 艺晶五金实业有限公司| 达美乐比萨有限公司| 苏州欧莱雅有限公司| 汇通信用担保有限公司| 海信香港电子有限公司| 艺鼎装饰设计有限公司| 诸城兴贸玉米有限公司| 伊兰丝家纺有限公司| 苏州中建材有限公司| 可儿婴儿用品有限公司| 滁州市贸易有限公司| 嘉兴环保工程有限公司| 凌致时装(天津)有限公司| 深圳东部公共交通有限公司| 沈阳桑拿设备有限公司| 慈溪监理监理有限公司| 南通奥普机械有限公司| 广州威健体育用品有限公司| 上海天合电子有限公司| 中兴通讯杭州有限公司| 湘潭冶金设备制造有限公司| 中山市厨田电器有限公司| 浙江亿江机电有限公司| 富尔道贵金属经营有限公司| 北京雷蒙德阀门有限公司| 北方液压机械有限公司| 肇庆鼎一食品有限公司| 一津国际贸易有限公司| 英商马田纺织品有限公司| 兴河建设工程有限公司| 上海先灵葆雅制药有限公司| 福建福州机械有限公司| 海龙王泵业有限公司| 荣文灯饰(东莞)有限公司| 安琪酵母(滨州)有限公司| 上海保得国际贸易有限公司 | 上海朝翔生物有限公司| 诚庆有限公司 电话| 广汽丰田销售有限公司| 佳采化妆品有限公司| 杭州数字电视有限公司| 力好工程机械有限公司| 奥联汽车电子电器有限公司| 烟台市有限公司招聘| 银谷普惠北京有限公司| 东莞市永正有限公司| 南昌工业设备有限公司| 天津机 有限公司怎么样| 万德福实业有限公司| 山西消防有限公司招聘| 青岛川海工程有限公司| 上海双贸易有限公司怎么样| 云南绿辣素有限公司| 无锡环保机械设备有限公司| 有限公司公司定额税| 上海 睿展贸易有限公司| 嘉宇进出口有限公司| 吉中汽车贸易有限公司| 上海嘉定燃气有限公司| 成都锦城置业有限公司| 联食通食品有限公司| 黄山市包装有限公司| 福达汽车工业有限公司| 富海电子深圳有限公司| 上海动力燃料有限公司| 杭州雅莱贸易有限公司| 惠州电力工程有限公司| 金百年珠宝有限公司| 大众平台零部件有限公司| 岳华会计师事务所有限公司| 珠海自行车有限公司| 伊诺特惠州有限公司| 津诚国有资本有限公司| nec光电 上海 有限公司| 深圳 分秒有限公司| 济丰包装(上海)有限公司| 合肥调味品有限公司| 合肥美菱电器有限公司| 神电汽车电机有限公司| 弓箭玻璃器皿南京有限公司| 浙能天然气运行有限公司| 圣昂达机械 天津 有限公司| 北京正和生物有限公司| 南京苏夏工程设计有限公司| 阳江厨房用品有限公司| 先锋高科(上海)有限公司| 北京甲骨文有限公司| 山东威海电子有限公司| 浙江朝晖过滤技术有限公司| 深圳电子精品有限公司| 上海佑科仪器有限公司| 广州公路工程有限公司| 昆明岩土工程有限公司| 萍乡甘源食品有限公司| 上海高时石材有限公司| 卡尔蔡司光学广州有限公司| 乐享家上海有限公司| 天津滨海 酒店有限公司| 阿波罗电子有限公司|